Big Yellow Self Storage - Fulham

Big Yellow Self Storage - Fulham

Cube was appointed to provide Cost Consultancy services for the conversion of a 1960’s power station into a state of the art storage facility for Big Yellow Self storage.

The project involved substantial de-contamination, demolition and retained façade works followed by the conversion of the building into a 240,000sq ft storage facility. Eight levels of steel mezzanine floor were installed together with curtain walling roofing and new lifts.

  • Location: Fulham, London
  • Client: Big Yellow Self Storage Ltd
  • Value: £6 Million
  • Detail:
    • Conversion of Lots Road Power Station into a 240,000 Sq ft storage facility including photovoltaic panels
    • A ground source heat pump installation, that provides a 10% reusable energy facility plus a “Green” roof

Latest News

Cube appointed at Pinewood Studios

17 November 2009

Cube have been appointed as Project Managers, Employer’s Agent and Cost Consultants by Pinewood Studios Group on the construction of secure temperature and humidity controlled storage for the Canal+ Image UK library assets, including the construction of two new state-of-the-art cold storage facilities on the Pinewood lot. The STUDIOCANAL British Library Archive is one of the [...]